Master Bathroom

About the Project

The client was looking for a modern master bathroom with upgraded amenities like digital water thermostats, custom tiling and pull out vanity drawers that included electrical outlets.  Regan Total Construction was able to deliver on a bathroom renovation that gave the client the upscale new master bathroom they wanted.  Here's what Regan Total Construction did:

  • Removed inset tub
  • Framed in flooring
  • Changed all of the existing plumbing
  • Added digital water thermostats to interior and exterior of shower to preset water temperature
  • Accent stone wall of marble ledge stone
  • Installed frameless shower door with two walls
  • Custom tile shower
  • Install of vanity with electrical outlets inside its pull out drawers

Owner Testimonial

"I am extremely pleased with our new master bathroom. Mike and his crew were wonderful. Mike assisted in the design, making several great suggestions based on extensive experience. The site was left clean and neat at the end of every workday. Our home office is directly below and the crew was so considerate in keeping the noise level to a minimum. I can’t rave enough about the quality of the workmanship and how great Mike and his team performed."

Nancy Kemmerer , Burlington, CT

See More Projects